Lighting & interior · A short practical guide
Heavy chandelier: what to assess besides the electrical point
A new chandelier weighs far more than the old one. A wire and existing hook do not establish suitable support.

What to check
Check weight, substrate, the supplied mounting plate and suspension length. Decorative assembly can add time. Electrical connection requires a licensed electrician; the mechanical fixing must suit the product.
Preparation and next steps
Send instructions, weight, ceiling height and a safe photo of the existing point without opening wiring. Agree removal and decorative assembly as part of the scope. Do not reuse an old suspension without checking its purpose and condition.
Separate the support, access and electrical work
For a heavy chandelier, assess the mechanical support, safe working access and electrical connection as separate parts of the job. A decorative canopy hides the connection area but does not show what supports the suspension. A ceiling photo helps plan an assessment; it cannot establish the capacity of a concealed substrate.
A structural concrete ceiling and a suspended ceiling are not interchangeable supports. If there is a void above the finish or the construction is unknown, confirm feasibility before lifting the fixture. Do not jerk an old hook to test it or hang the chandelier temporarily to see whether it holds.
Prepare these details without opening the ceiling connection
- The exact model, manual and assembled fixture weight; do not substitute shipping weight for product weight.
- Photos of the supplied mounting plate, suspension and parts, taken before anything is raised overhead.
- A wide photo of the ceiling and old fitting from floor level, room height and any known ceiling construction details.
- The fixture's diameter or overall dimensions, preferred suspension length and furniture beneath the proposed position.
- Whether an old light needs removing, fragile shades or decorative parts need assembly, and the work area can be cleared.
Agree which operations are included
Preparing the support, assembling decorations, removing the old fixture and making an electrical connection are different operations. Confirm who is responsible for each and whether another professional or helper is needed. If the substrate is unsuitable, agree a solution first; having a cable in the right place does not establish a suitable support.
Leave electrical connection to an appropriately qualified and licensed electrician. Do not open connections or test wires yourself. For example, the Signify luminaire instructions expressly call for a qualified electrician. Use your own chandelier's manual for its fixing arrangement and limits, not the instructions for a different fixture.
Questions about a heavy chandelier
Can the hook from a lighter fitting stay?
Only after checking its purpose, condition, supporting substrate and compatibility with the new fixture. Appearance alone cannot establish that an existing suspension is suitable.
Can a photo give an exact installation price?
Photos help discuss a preliminary scope. An unknown substrate, height, awkward access or decorative assembly may require assessment and a clearer scope before a final price is agreed.
What if the old fitting moves or the ceiling around it is cracked?
Do not add a load or try to tighten the support yourself. Keep people clear of the area beneath it and arrange a professional assessment. A damaged substrate needs checking, not covering with a new canopy.
FIX&GO · animated advertisement
A random episode in English
Animated advertisement, not footage of an actual job. Muted autoplay; pauses when off screen.
Photos + dimensions + city + preferred time.
Understanding the prices
These are labour estimates, not a final quotation. Fixings, materials, removal, difficult access, a helper and additional jobs are agreed separately. Confirm the minimum visit charge and total before booking.